Safety Instrument System

Tank Overfill Protection - Management of Functional Safety

P & I Design Ltd

DOCUMENT NO: SI277102_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: B DATE:10.10.12

Tel: + 44 (0)1642 617444

PAGE 22 OF 22

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

18.0 FUNCTIONAL SAFETY ASSESSMENT – STAGE 5 DECOMMISSIONING

This assessment is to review the impact of decommissioning the SIS.

The FSA will address the following as a minimum:

Review of functional safety during the decommissioning

Review the impact of decommissioning

Roles and Responsibilities:

Immingham Storage Ltd:

Attendance of competent personnel relevant to the required disciplines to participate in the

FSA.

Personnel assigned to this phase to be detailed at the time of de-commissioning.

Design Consultant.

Attendance of competent personnel relevant to the decommissioning of the SIS. Provide the

FSA team with all necessary documentation. Update this Management of Functional Safety

Document.

Personnel assigned to this phase to be detailed at the time of de-commissioning.