Table of Contents Table of Contents
Previous Page  15 / 124 Next Page
Information
Show Menu
Previous Page 15 / 124 Next Page
Page Background

South-North Corridor GRIP 2017 |

15

2.1 Introduction

This chapter is divided in two main sections:

The first contains an overview of the supply sources

available to the Region, with indications of their

weights in the past years followed by envisaged high

level overview of potential future evolutions according

to major elements which may alter the current flow

patterns.

The second summarises the projects planned in

the next 20 years in the Region based on ENTSOG

TYNDP 2017, split up for the three traditional infra-

structure categories – transmission, storages and

LNG terminals – and analysed according to different

perspectives, such as development status and main

technical features.