20 |
South-North Corridor GRIP 2017
According to this classification, the pie chart in Figure 2.3 illustrates the number of
projects in the South-North Corridor Region, combined with the category of asset
(transmission networks, storage sites, LNG regasification plants) and the develop-
ment status.
Number of Projects
17
17
10
2
2
4
1 1
TRA – FID
TRA – Advanced Non-FID
TRA – Less-Advanced Non-FID
UGS – FID
UGS – Advanced Non-FID
UGS – Less-Advanced Non-FID
LNG – FID
LNG – Advanced Non-FID
LNG – Less-Advanced Non-FID
Figure 2.3:
Number of infrastructure projects per class (LNG, storages, pipelines) and status
(FID, advanced non-FID and less-advanced non-FID) in the South-North Corridor
Region (Source: ENTSOG data collection for TYNDP 2017 based on information
submitted by TSOs and other project promoters)
Transmission networks projects cover 81,5% of the total amount (44 projects), while
storage and LNG regasification show lower percentages, 7.5% (4 projects) and
11% (6 projects) respectively.
In general, the projects are equally distributed among the different statuses, although
“FID” projects cover a higher percentage in transmission network and storage pro-
jects, while the most frequent status for LNG projects is “Less advanced non-FID”.