Table of Contents Table of Contents
Previous Page  20 / 124 Next Page
Information
Show Menu
Previous Page 20 / 124 Next Page
Page Background

20 |

South-North Corridor GRIP 2017

According to this classification, the pie chart in Figure 2.3 illustrates the number of

projects in the South-North Corridor Region, combined with the category of asset

(transmission networks, storage sites, LNG regasification plants) and the develop-

ment status.

Number of Projects

17

17

10

2

2

4

1 1

TRA – FID

TRA – Advanced Non-FID

TRA – Less-Advanced Non-FID

UGS – FID

UGS – Advanced Non-FID

UGS – Less-Advanced Non-FID

LNG – FID

LNG – Advanced Non-FID

LNG – Less-Advanced Non-FID

Figure 2.3:

Number of infrastructure projects per class (LNG, storages, pipelines) and status

(FID, advanced non-FID and less-advanced non-FID) in the South-North Corridor

Region (Source: ENTSOG data collection for TYNDP 2017 based on information

submitted by TSOs and other project promoters)

Transmission networks projects cover 81,5% of the total amount (44 projects), while

storage and LNG regasification show lower percentages, 7.5% (4 projects) and

11% (6 projects) respectively.

In general, the projects are equally distributed among the different statuses, although

“FID” projects cover a higher percentage in transmission network and storage pro-

jects, while the most frequent status for LNG projects is “Less advanced non-FID”.