TRANSMISSION PROJECTS

Project Promoter

Name

TYNDP Code

FID Status

Commissioning

GRTgaz Deutschland GmbH

CS Rothenstadt

TRA-F-337

FID

2018

West to East operation of the IP Waidhaus

TRA-F-753

FID

2018

CS Rimpar

TRA-N-755

Non-FID (L. Adv.)

2023

GRTgaz, GRDF and Storengy

Adaptation L- gas - H-gas

TRA-N-429

Non-FID (Adv.)

2018

Natural Gas Submarine

Interconnector Greece–Italy

Poseidon S.A

Poseidon Pipeline

TRA-N-010

Non-FID (Adv.)

2020

NEL Gastransport,

Fluxys Deutschland,

Gasunie Deutschland

Extension Receiving Terminal Greifswald

TRA-F-768

FID

2017

Nord Stream 2 AG

Nord Stream 2

TRA-F-937

FID

2019

ONTRAS Gastransport GmbH

Upgrade IP Deutschneudorf and Lasow

TRA-N-814

Non-FID (Adv.)

2016

Open Grid Europe GmbH

Pipeline project “Schwandorf-Finsing”

TRA-F-343

FID

2018

Compressor station “Herbstein”

TRA-F-344

FID

2018

Compressor station “Werne”

TRA-F-345

FID

2018

ZEELINK

TRA-N-329

Non-FID (L. Adv.)

2021

Compressor station “Legden”

TRA-N-825

Non-FID (L. Adv.)

2023

Snam Rete Gas S.p.A.

Support to the North West market and bidirectional

cross-border flows

TRA-F-214

FID

2018

Development for new import from the South

(Adriatica Line)

TRA-N-007

Non-FID (L. Adv.)

2023

Interconnection with Slovenia

TRA-N-354

Non-FID (L. Adv.)

2023

Import developments from North-East

TRA-N-008

Non-FID (L. Adv.)

2034 *

Additional Southern developments

TRA-N-009

Non-FID (L. Adv.)

2034 *

Società Gasdotti Italia

LARINO - RECANATI Adriatic coast backbone

TRA-N-974

Non-FID (Adv.)

2022

Sardinia Gas Transportation Network

TRA-N-975

Non-FID (L. Adv.)

2031

TIGF

South Transit East Pyrenees (STEP) – TIGF

TRA-N-252

Non-FID (Adv.)

2022

TIGF – GRTgaz

Gascogne Midi

TRA-F-331

FID

2018

Trans Adriatic Pipeline AG

Trans Adriatic Pipeline

TRA-F-051

FID

2019

*assumed by ENTSOG for TYNDP modelling purposes

Table 2.1:

List of transmission projects [Adv.: advanced; L. Adv.: less-advanced]

(Source: ENTSOG data collection for TYNDP 2017 based on information submitted by TSOs and other project promoters)