22 |
South-North Corridor GRIP 2017
2.3.1 TRANSMISSION NETWORKS
The greatest part of the projects planned in the next two decades in the South-North
Corridor are related to the development of the transmission networks (new pipelines,
compressor stations, adaptation of existing infrastructure, etc.).
A detailed list of the projects belonging to this asset category is compiled in Table
2.1. This table is filled using information collected by ENTSOG by May 2016 for
TYNDP 2017 purposes.
TRANSMISSION PROJECTS
Project Promoter
Name
TYNDP Code
FID Status
Commissioning
bayernets GmbH
MONACO section phase I (Burghausen-Finsing)
TRA-F-241
FID
2017
VDS Wertingen
TRA-N-340
Non-FID (L. Adv.)
2019
FluxSwiss
Reverse Flow Transitgas Switzerland
TRA-F-230
FID
2018
Fluxys Belgium
L/H Conversion
TRA-N-500
Non-FID (Adv.)
2020
Fluxys TENP GmbH &
Open Grid Europe GmbH
Reverse Flow TENP Germany
TRA-F-208
FID
2018
Galsi S.p.A.
GALSI Pipeline Project
TRA-N-012
Non-FID (Adv.)
2019
GASCADE Gastransport GmbH
NOWAL – Nord West Anbindungsleitung
TRA-F-291
FID
2017
EUGAL – Europaeische Gasanbindungsleitung
(European Gaslink)
TRA-N-763
Non-FID (Adv.)
2019
Gastransport Nord GmbH
Oude(NL)-Bunde(DE) GTG H-Gas
TRA-N-949
Non-FID (L. Adv.)
2020
Gasunie Deutschland
Transport Services GmbH
Embedding CS Folmhusen in H-Gas
TRA-N-951
Non-FID (L. Adv.)
2020
Transport of gas volumes to the Netherlands
TRA-N-808
Non-FID (Adv.)
2021
Additional East-West transport NL
TRA-N-809
Non-FID (L. Adv.)
2023
GUD: Complete conversion to H-gas
TRA-N-955
Non-FID (L. Adv.)
2030
Gasunie Deutschland,
NEL Gastransport,
Fluxys Deutschland
Expansion NEL
TRA-N-807
Non-FID (Adv.)
2020
GRTgaz
Val de Saône project
TRA-F-43
FID
2018
Reverse capacity from CH to FR at Oltingue
TRA-F-45
FID
2018
Gascogne-Midi: adaptation of stations in
Cruzy and St Martin
TRA-F-391
FID
2018
Reverse capacity from France to Germany
at Obergailbach
TRA-N-047
Non-FID (L. Adv.)
2022
Developments for Montoir LNG terminal
2.5 bcm expansion
TRA-N-258
Non-FID (L. Adv.)
2022
Developments for Fosmax (Cavaou) LNG
8.25 bcm expansion
TRA-N-269
Non-FID (L. Adv.)
2022
GRTgaz and TIGF
Iberian-French corridor: Eastern Axis-Midcat Project
TRA-N-256
Non-FID (L. Adv.)
2024