Previous Page  60 / 155 Next Page
Information
Show Menu
Previous Page 60 / 155 Next Page
Page Background

BL Companies

//

File Management & CADD Standards Manual



Creating a sketch (

cont. )

Job Captain / PA’s should (prior to

the CA phase) copy the 4

templates to your project

directory’s sketch

folder: ##X####\ C‐

ADMIN\SKETCHES. AŌer they are

copied there, fill in all the project

specific informaƟon on the Ɵtle

blocks. This way, all your sketches

will be ready for you and correctly

formaƩed. When creaƟng a

sketch you can now navigate to

these project specific sketches

templates.

Fill-in sketch specific information, i.e., date, scale…

Origin is the directive the sketch will be

issued with i.e. ASI #001, RRFI #001…

DWG.

Ref.is

the drawing number and

sheet that you are revising (example 2/

A6.03).



Right click on your sketch’s

paperspace tab and “Rename”

the tab to your sketch number

(example ASK– 005). This will

automatically fill in the sketch

number field in the title block (it

is a dynamic field).

The sketch number field in the title

block may not update immediately. You can type

“updatefield” then type “all” and all fields will

update. But it will definitely update upon regen,

plotting and saving/reopening.

Revision clouds will be placed in

paperspace. No REV tags are

necessary.

Revision clouds shall be placed on the 0-REV-0

layer.

Print the sketch to a PDF. By

default, the sketch template file

should be formatted to initially plot to a PDF in t

he print dialogue box.



Save the PDF to your sketch folder:

##X####\DOCS\CADMIN\SKETCHES.



It is extremely important to maintain a PDF

version of the sketch. This will be the only

record of a change as it certain to this issuance

of the sketch.

Construction Administration Phase and Sketches

(cont.)

Section 2

//

Page 34

< < <

> > > TUTORIALS < < <

+ BEST PRACTICES & TUTORIALS

(CONT.)