Expected Gas Sourcing
LNG (?)
Benefits
Main Driver
Market Demand
Main Driver Explanation
The project is designed to cover several market segments with the main volume driver LNG send out to marine and industrial segments but also for
injection to Swedegas' existing transmission grid.
Benefit Description
Facilitates supply to non grid customers, such as industry replacing oil and future bunkering of ships to comply with the coming SECA regulation.
Connetion to the grid allows an second entry point to the Swedish transmission grid increasing security of supply and competition. Connection also
timproves functionality such as pressure holding, short term storage etc.
Technical Information (LNG)
LNG Facility
GO4LNG Gothenburg
Expected Volume (bcm/y)
1
Storage Capacity (m3)
25,000
7,500 m3 bullet tanks or 25,000 m3 full containment tank
Ship Size (m3)
75,000
This size is subject to certain availability at the jetty. If not available, 15600 m3 is the limit.
Reloading Ability
Yes
Time Schedule
Grant Obtention Date
Delay Since Last TYNDP
Delayed
Delay Explanation
Slower market development than expected.
PCI Details
PCI Benefits
Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project aims at
supplying directly or indirectly at least two Member States
General Criteria Fulfilled
Yes
Specific Criteria Fulfilled
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 503 of 620
Current TYNDP : TYNDP 2017 - Annex A