Expected Gas Sourcing

LNG (?)

Benefits

Main Driver

Market Demand

Main Driver Explanation

The project is designed to cover several market segments with the main volume driver LNG send out to marine and industrial segments but also for

injection to Swedegas' existing transmission grid.

Benefit Description

Facilitates supply to non grid customers, such as industry replacing oil and future bunkering of ships to comply with the coming SECA regulation.

Connetion to the grid allows an second entry point to the Swedish transmission grid increasing security of supply and competition. Connection also

timproves functionality such as pressure holding, short term storage etc.

Technical Information (LNG)

LNG Facility

GO4LNG Gothenburg

Expected Volume (bcm/y)

1

Storage Capacity (m3)

25,000

7,500 m3 bullet tanks or 25,000 m3 full containment tank

Ship Size (m3)

75,000

This size is subject to certain availability at the jetty. If not available, 15600 m3 is the limit.

Reloading Ability

Yes

Time Schedule

Grant Obtention Date

Delay Since Last TYNDP

Delayed

Delay Explanation

Slower market development than expected.

PCI Details

PCI Benefits

Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project aims at

supplying directly or indirectly at least two Member States

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability