New NTS developments for taking over gas from the Black Sea shore
General Information
Promoter
SNTGN Transgaz SA
Operator
SNTGN Transgaz S.A.
Host Country
Romania
Status
Planned
Website
Publication Approval Status
Approved
Sponsors
SNTGN Transgaz SA
100%
TRA-N-964
Project
Pipeline including CS
Non-FID
Update Date
07/05/2016
Non-Advanced
Description
The project consists of the NTS extension for creating an additional overtaking point for the offshore Black Sea blocks gas. In this respect it is
considered the building of a transmission pipeline approximately 25 ² 30-km long, from the Black Sea shore to the existing T1 international
transmission pipeline.
Regulatory Decisions and
similar material conditions
Schedule
Start Date
End Date
Pre-Feasibility
Feasibility
FEED
Market Test
12/2016
Permitting
Supply Contracts
FID
Construction
Commissioning
2019
2019
NDP and PCI Information
Part of NDP
Yes (Development Plan for the National
GTS 2016 - 2025)
NDP Number
7.6
Currently PCI
No
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
Not Relevant
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%