Project GO4LNG LNG terminal Gothenburg

General Information

Promoter

Swedegas AB

Operator

Swedegas AB

Host Country

Sweden

Status

Planned

Website

Project's URL

Publication Approval Status

Approved

Sponsors

Swedegas AB

100%

LNG-N-032

Project

LNG Terminal

Non-FID

Update Date

04/05/2016

Advanced

Description

A small-scale LNG terminal, including connection to the transmission grid, placed in the Gothenburg harbour, with flexible send out by rail, truck,

bunkering and regasification.

Regulatory Decisions and

similar material conditions

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Gothenburg LNG

Swedegas AB

2020

LNG_Tk_SE

SE

26.0 GWh/d

Schedule

Start Date

End Date

Pre-Feasibility

01/2012

Feasibility

01/2012

06/2012

FEED

04/2016

10/2016

Market Test

01/2013

Permitting

10/2013

05/2014

Supply Contracts

12/2016

FID

01/2017

Construction

01/2017

01/2020

Commissioning

2020

2020

NDP and PCI Information

Part of NDP

No (Not applicable for Sweden. There is no

NDP. )

NDP Number

Currently PCI

Yes (8.6)

CBCA Decision

Yes (2015-10-01)

Market Survey

Open Season(2013-02-27)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

No

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 502 of 620

Current TYNDP : TYNDP 2017 - Annex A