EUGAL - Europaeische Gasanbindungsleitung (European Gaslink)

TRA-N-763

Project

Pipeline including CS

Non-FID

Update Date

24/05/2016

Advanced

Description

It connects NOS2 with PL, NL, CZ, GP and NCG and increases the security of supply based on the market survey MORE CAPACITY (www.more-

capacity.eu/en)

Regulatory Decisions and

similar material conditions

on basis of the unit investment costs according to ACER and when not available internal cost estimations - these are preliminary costs representing

the current cost esimations (04/2016) -

(http://www.acer.europa.eu/official_documents/acts_of_the_agency/publication/uic%20report%20-%20gas

%20infrastructure.pdf).

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

HSK-EUGAL (CZ) / Deutschneudorf 2 (DE)

GASCADE Gastransport GmbH

2019

DEg

CZ

661.2 GWh/d

Comment: Level 1 - Exit Deutschneudorf2

GASCADE Gastransport GmbH

2020

DEg

CZ

535.2 GWh/d

Comment: Level 2 includes Level 1 in total 1,196.4 GWh/d - Exit Deutschneudorf2

GASCADE Gastransport GmbH

2021

DEg

CZ

214.8 GWh/d

Comment: Level 3 includes Level 1+2 in total 1,411.2 GWh/d - Exit Deutschneudorf2

Mallnow

GASCADE Gastransport GmbH

2019

DEg

PL/YAM

138.6 GWh/d

Comment: Level 1 - Exit Mallnow

GASCADE Gastransport GmbH

2020

DEg

PL/YAM

112.1 GWh/d

Comment: Level 2 includes Level 1 in total 250.7 GWh/d - Exit Mallnow

GASCADE Gastransport GmbH

2021

DEg

PL/YAM

85.8 GWh/d

Comment: Level 3 includes Level 1+2 in total 336.5 GWh/d - Exit Mallnow

Vierow

GASCADE Gastransport GmbH

2019

RU/NO2

DEg

946.8 GWh/d

Comment: Level 1 - Entry Vierow

GASCADE Gastransport GmbH

2020

RU/NO2

DEg

612.0 GWh/d

Comment: Level 2 includes Level 1 in total 1,558.8 GWh/d - Entry Vierow

GASCADE Gastransport GmbH

2021

RU/NO2

DEg

343.1 GWh/d

Comment: Level 3 includes Level 1+2 in total 1,901.9 GWh/d - Entry Vierow

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 95 of 620

Current TYNDP : TYNDP 2017 - Annex A