EUGAL - Europaeische Gasanbindungsleitung (European Gaslink)
TRA-N-763
Project
Pipeline including CS
Non-FID
Update Date
24/05/2016
Advanced
Description
It connects NOS2 with PL, NL, CZ, GP and NCG and increases the security of supply based on the market survey MORE CAPACITY (www.more-
capacity.eu/en)Regulatory Decisions and
similar material conditions
on basis of the unit investment costs according to ACER and when not available internal cost estimations - these are preliminary costs representing
the current cost esimations (04/2016) -
(http://www.acer.europa.eu/official_documents/acts_of_the_agency/publication/uic%20report%20-%20gas%20infrastructure.pdf).
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
HSK-EUGAL (CZ) / Deutschneudorf 2 (DE)
GASCADE Gastransport GmbH
2019
DEg
CZ
661.2 GWh/d
Comment: Level 1 - Exit Deutschneudorf2
GASCADE Gastransport GmbH
2020
DEg
CZ
535.2 GWh/d
Comment: Level 2 includes Level 1 in total 1,196.4 GWh/d - Exit Deutschneudorf2
GASCADE Gastransport GmbH
2021
DEg
CZ
214.8 GWh/d
Comment: Level 3 includes Level 1+2 in total 1,411.2 GWh/d - Exit Deutschneudorf2
Mallnow
GASCADE Gastransport GmbH
2019
DEg
PL/YAM
138.6 GWh/d
Comment: Level 1 - Exit Mallnow
GASCADE Gastransport GmbH
2020
DEg
PL/YAM
112.1 GWh/d
Comment: Level 2 includes Level 1 in total 250.7 GWh/d - Exit Mallnow
GASCADE Gastransport GmbH
2021
DEg
PL/YAM
85.8 GWh/d
Comment: Level 3 includes Level 1+2 in total 336.5 GWh/d - Exit Mallnow
Vierow
GASCADE Gastransport GmbH
2019
RU/NO2
DEg
946.8 GWh/d
Comment: Level 1 - Entry Vierow
GASCADE Gastransport GmbH
2020
RU/NO2
DEg
612.0 GWh/d
Comment: Level 2 includes Level 1 in total 1,558.8 GWh/d - Entry Vierow
GASCADE Gastransport GmbH
2021
RU/NO2
DEg
343.1 GWh/d
Comment: Level 3 includes Level 1+2 in total 1,901.9 GWh/d - Entry Vierow
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 95 of 620
Current TYNDP : TYNDP 2017 - Annex A