Benefits
Main Driver
Market Demand
Main Driver Explanation
Benefit Description
PCI Details
PCI Benefits
General Criteria Fulfilled
No
Specific Criteria Fulfilled
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Barriers
Barrier Type
Description
Market
Currently negotiations are ongoing with Norwegian partner. An important issue is the coordination with the Baltic pipe project (connection between DK
and PL).
Schedule
Start Date
End Date
Pre-Feasibility
Feasibility
09/2015
12/2016
FEED
Market Test
Permitting
Supply Contracts
FID
Construction
Commissioning
2022
2022
NDP and PCI Information
Part of NDP
No (This is an upstream project from the
North Sea (Norway) to a Danish North Sea
Platform. The project is vital for the Baltic-
Pipe project (gas pipeline between
Denmark and Poland).
The project will be included in future
national plans in connection when
possibly including the Baltic Pipe.)
NDP Number
Currently PCI
No
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Not Applicable
Considered Tariff Regime
Not Applicable
Applied for Exemption
Not Relevant
Exemption Granted
Not Relevant
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%