Page Background

(Mirror) Baltic Pipe

General Information

Promoter

Energinet.dk

Operator

Energinet.dk

Host Country

Denmark

Status

Planned

Website

Publication Approval Status

Approved

Sponsors

TRA-N-428

Project

Pipeline including CS

Non-FID

Update Date

20/05/2016

Non-Advanced

Description

7KLV LV D PLUURU SURMHFW IRU WKH %DOWLF 3LSH SURPRWHG E\ *D] 6\VWHP 6 $ (QWU\ ([LW LV 'UDJ¡U LQ 'HQPDUN DQG 1LHFKRU]H LQ 3RODQG 7KH LGHQWLILHG

feasible infrastructure solution is a 3-10 bcm/y upstream connection from the Northsea gas-fields to Deanmark with transport through the Danish

transmission system to Entry/Exit point of Baltic Pipe and further transport through Baltic Pipe to Niechorze (entry/exit) in Poland. In accordance with

the ungoing feasibility study,

Energinet.dk·

s mirror project is: - capacity increment ²

GWh/d (10 bcm/y) from DK=>PL and 91.1 GWh/d

(3bcm/y) from PL => DK - year of commissioning ²

FID status ² no - PCI status ² yes

Regulatory Decisions and

similar material conditions

Enabled Projects

Project Code Project Name

TRA-N-394 Gassled - Danish upstream system

TRA-N-780 Nybro-Interconnector PL-DK - reinforcement

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Interconnector PL-DK

Energinet.dk

2022

DK

PL

306.8 GWh/d

Energinet.dk

2022

PL

DK

91.1 GWh/d

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 121 of 620

Current TYNDP : TYNDP 2017 - Annex A