Table of Contents Table of Contents
Previous Page  250-251 / 1248 Next Page
Information
Show Menu
Previous Page 250-251 / 1248 Next Page
Page Background

Benefits

Main Driver

Market Demand

Main Driver Explanation

Benefit Description

PCI Details

PCI Benefits

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation

prior to the commissioning of the project, Project concerns investment in reverse flow capacity

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

TRA-N-394 Gassled - Danish upstream system

Schedule

Start Date

End Date

Pre-Feasibility

Feasibility

09/2015

12/2016

FEED

Market Test

Permitting

Supply Contracts

FID

Construction

Commissioning

2022

2022

NDP and PCI Information

Part of NDP

No (Presently a feasibility study for the

Baltic Pipe is carried out in cooperation

between Gaz-System (Polish TSO) and

Energinet.dk.

The study will be finalized by

end of 2016. If the study recommends a

capacity of Baltic Pipe well above 3 bcm/y

, this reinforcement project will be

included in NDP.)

NDP Number

Currently PCI

No

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

Yes

Exemption Granted

Yes

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 125 of 620

Current TYNDP : TYNDP 2017 - Annex A