Balticconnector

General Information

Promoter

Elering AS

Operator

Elering AS

Host Country

Estonia

Status

Planned

Website

Project's URL

Publication Approval Status

Approved

Sponsors

EE Kiili pressure reduction station

Elering AS

100%

EE Kiili-Paldiski pipeline

Elering AS

100%

EE Paldiski metering and Compressor station

Elering AS

100%

FI Inkoo metering and compressor station

Baltic Connector OY

100%

FI Inkoo-Siuntio pipeline

Baltic Connector OY

100%

FI-EE Inkoo-Paldiski Offshore pipeline

Baltic Connector OY

50%

Elering AS

50%

TRA-N-895

Project

Pipeline including CS

Non-FID

Update Date

20/05/2016

Advanced

Description

New bidirectional offshore pipeline Inkoo Paldiski, DN500, 80 bar of 80 km, plus 50 km onshore pipeline in EE Kiili Paldiski pipeline, DN 700, 55 bar

and 20 km onshore pipeline in FI Siuntio Inkoo pipeline, DN500, 80 bar including metering and compressor stations at both ends with a daily

nominal capacity of 7.2 mcm/day. The power of each compressor station is about 10 MW.

Regulatory Decisions and

similar material conditions

The Regulators of Finland Energiavirasto and Estonia Konkurentsiamet have made a common CBCA decision for the Balticconnector and

Estonia Latvia interconnection project.

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Balticonnector / Paldiski (EE)

Elering AS

2019

EE

FI/BAC

79.0 GWh/d

Elering AS

2019

FI/BAC

EE

79.0 GWh/d