Adaptation L- gas - H-gas

General Information

Promoter

GRTgaz, GRDF and

Storengy

Operator

GRTgaz

Host Country

France

Status

Planned

Website

Publication Approval Status

Approved

Sponsors

Distribution

GRDF

65%

Storage

Storengy

2%

Transmission

GRTgaz

33%

TRA-N-429

Project

Pipeline including CS

Non-FID

Update Date

19/05/2016

Advanced

Description

The L-gas area covers around 10% of French gas consumption. It depends on the Netherlands L-gas production as the single supply source on

annual basis. Additional flexibilty is ensured by Gournay UGS and peak H-to-L conversion facility at Loon-Plage. Due to the decline of L-gas

production the conversion of the whole French L-gas area will have to be achieved by the end of 2029. The project covers both the required

infrastructure to ensure access to H-gas supply and all required actions for the switch to H-gas. This project is coordinated with Belgian and Dutch

operators.

Regulatory Decisions and

similar material conditions

The conversion project in France is covered by: - Article 164 of the Energy Transition Law (18/08/2015) - Decree 2016-348 (23/03/2016)

Transmission, distribution and storage operators are preparing a conversion plan to be submitted to the French ministries by September 2016. Based

on this conversion plan, the NRA will carry out an economical and technical analysis.

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 209 of 620

Current TYNDP : TYNDP 2017 - Annex A