PCI Details

PCI Benefits

General Criteria Fulfilled

No

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

The project will ensure that gas consumers of the former L-gas area will benefit from the same competitive and secured supply as H-gas

consumers.

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Arleux interconnection station

Adaptation

Bethune area

New pipeline

300

8

Brouckerque area

New pipeline

200

2

Connection to H-gas grid

*UDYHOLQHV 'LpYDO ,VEHUJXHV 2UFKLHV %HDXUHYRLU &DXODLQFRXUW

and Nesle

Interconnection with Gournay UGS

Adaptation

Loon Plage H-to-L adaptator

Adaptation

Taisnieres interconnection station

Adaptation

Total

10

Schedule

Start Date

End Date

Pre-Feasibility

07/2015

Feasibility

08/2015

10/2016

FEED

08/2015

10/2016

Market Test

03/2017

Permitting

11/2016

02/2018

Supply Contracts

FID

10/2016

Construction

04/2017

12/2026

Commissioning

2018

2018

NDP and PCI Information

Part of NDP

Yes (GRTgaz PDD 2015)

NDP Number

na

Currently PCI

No

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

Not Relevant

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM