PCI Details

PCI Benefits

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation

prior to the commissioning of the project, Project concerns investment in reverse flow capacity

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Poseidon pipeline

In 2015 technical studies have been finalized for the potential

upgrade of capacity up to 20 Bcm/yr in order to allow the

transportation of gas from sources available at the Greek

borders and from the sources recently discovered in East Med

region.

808

216

120

Total

216

120

Schedule

Start Date

End Date

Pre-Feasibility

06/2003

Feasibility

03/2004

10/2007

FEED

04/2010

04/2013

Market Test

06/2017

Permitting

11/2006

12/2016

Supply Contracts

12/2017

FID

06/2017

Construction

12/2017

07/2020

Commissioning

2020

2020

NDP and PCI Information

Part of NDP

No (Poseidon pipeline is mentioned in the

latest Italian NDP in ANNEX 4 (page 76)

while in the Greek NDP there is no

reference to the project, since it constitutes

an Independent Natural Gas System

(INGS).

)

NDP Number

Currently PCI

Yes (7.1.4)

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Not Applicable

Considered Tariff Regime

Not Applicable

Applied for Exemption

Yes

Exemption Granted

Yes

Exemption in entry direction

0.00%

Exemption in exit direction

89.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 213 of 620

Current TYNDP : TYNDP 2017 - Annex A