LNG terminal in northern Greece / Alexandroupolis - Pipeline Section
General Information
Promoter
Gastrade S.A.
Operator
Gastrade S.A.
Host Country
Greece
Status
Planned
Website
Project's URLPublication Approval Status
Approved
Sponsors
LNG-N-062
GASTRADE S.A.
100%
TRA-N-063
GASTRADE S.A.
100%
TRA-N-063
Project
Pipeline including CS
Non-FID
Update Date
20/05/2016
Advanced
Description
Please note that this part refers only to the pipeline section of the Project. The LNG section of the Project is addressed in LNG-N-062. The project
consists of an LNG offshore Floating Storage Regasification Unit, a Mooring & a Pipeline system (24km Subsea and 4km Onshore), connecting the
floating unit to the Greek National Natural Gas System at the area of Amfitriti, 5.5km NE of Alexandroupolis where, DESFA, the NNGS TSO, will build
a metering & regulating station. The regasified LNG will be transmissioned from the floating unit to the 30'' subsea and onshore pipeline through a
Pipeline End Manifold. A valve station will be established to the shore-crossing point of the pipeline. The maximum capacity of the pipeline is 6.1
bcm/y.
Regulatory Decisions and
similar material conditions
No TPA exemption requested NRA only gave opinion on the Independent Natural Gas System License issued by the Ministry of Energy &
Environment on 19.08.2011 (opin. number 29/2011)
Enabled Projects
Project Code Project Name
LNG-N-062 LNG terminal in northern Greece / Alexandroupolis - LNG Section
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Alexandropoulis LNG
Gastrade S.A.
2018
LNG_Tk_GR
GRa
187.5 GWh/d
Comment: Increment not assessed by ENTSOG: Submitted in the linked Pipelines project
Alexandroupolis Amphitriti
Gastrade S.A.
2018
GRa
IB-GRk
268.0 GWh/d
Comment: Increment not assessed by ENTSOG: Submitted in the linked LNG project
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 227 of 620
Current TYNDP : TYNDP 2017 - Annex A