Hungarian section of Tesla project

General Information

Promoter

FGSZ Ltd.

Operator

FGSZ Ltd.

Host Country

Hungary

Status

Planned

Website

Publication Approval Status

Approved

Sponsors

FGSZ Ltd.

100%

TRA-N-585

Project

Pipeline including CS

Non-FID

Update Date

27/05/2016

Non-Advanced

Description

The main aim of the Tesla project is to transport natural gas from the planned Turkish Stream (RU-TR) to Central and Eastern Europe via Greece,

Macedonia, Serbia, Hungary and Austria. The Hungarian section is part of the TR-GR-FYROM-SRB-HU-AT corridor. The main flow direction is from

Turkey to Austria, but accoridng to EU rules we intend to ensure the reverse flow (from Austria to Turkey) with the same capacity as the main flow

direction.

Regulatory Decisions and

similar material conditions

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

TESLA / HU Offtake

FGSZ Ltd.

2020

HU/TLA

HU

175.0 GWh/d

TESLA / RS>HU

FGSZ Ltd.

2020

RS/TLA

HU/TLA

582.0 GWh/d

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM