Enhancement of Transmission Capacity of Slovak-Hungarian interconnector

General Information

Promoter

0DJ\DU *i] 7UDQ]LW =UW

Operator

MGT Hungarian Gas Transit

Ltd.

Host Country

Hungary

Status

Planned

Website

Publication Approval Status

Approved

Sponsors

TRA-N-524

Project

Pipeline including CS

Non-FID

Update Date

25/05/2016

Non-Advanced

Description

Enhancement of Exit transmission capacity with 102 GWh/day in HU>SK direction and enhancement of Entry transmission capacity with 26 GWh/day

in SK>HU direction at Balassagyarmat with new compressors on Szada Compressor station. The available bi-directional transmission capacities will

be the same in both direction at the Slovak-Hungarian interconnector.

Regulatory Decisions and

similar material conditions

Enabled Projects

Project Code Project Name

TRA-F-148 6ORYDN +XQJDULDQ LQWHUFRQQHFWRU 9HFVpV 6]DGD %DODVVDJ\DUPDW

TRA-N-636 Development of Transmission Capacity at Slovak-Hungarian interconnector

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

%DODVVDJ\DUPDW +8 9HONp =OLHYFH 6.

MGT Hungarian Gas Transit Ltd.

2017

HUi

SK

102.0 GWh/d

MGT Hungarian Gas Transit Ltd.

2017

SK

HUi

26.0 GWh/d

9HFVpV 0*7 )*6=

MGT Hungarian Gas Transit Ltd.

2017

HU

HUi

102.0 GWh/d

Comment: .

MGT Hungarian Gas Transit Ltd.

2017

HUi

HU

26.0 GWh/d

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 328 of 620

Current TYNDP : TYNDP 2017 - Annex A