Enhancement of Transmission Capacity of Slovak-Hungarian interconnector
General Information
Promoter
0DJ\DU *i] 7UDQ]LW =UW
Operator
MGT Hungarian Gas Transit
Ltd.
Host Country
Hungary
Status
Planned
Website
Publication Approval Status
Approved
Sponsors
TRA-N-524
Project
Pipeline including CS
Non-FID
Update Date
25/05/2016
Non-Advanced
Description
Enhancement of Exit transmission capacity with 102 GWh/day in HU>SK direction and enhancement of Entry transmission capacity with 26 GWh/day
in SK>HU direction at Balassagyarmat with new compressors on Szada Compressor station. The available bi-directional transmission capacities will
be the same in both direction at the Slovak-Hungarian interconnector.
Regulatory Decisions and
similar material conditions
Enabled Projects
Project Code Project Name
TRA-F-148 6ORYDN +XQJDULDQ LQWHUFRQQHFWRU 9HFVpV 6]DGD %DODVVDJ\DUPDW
TRA-N-636 Development of Transmission Capacity at Slovak-Hungarian interconnector
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
%DODVVDJ\DUPDW +8 9HONp =OLHYFH 6.
MGT Hungarian Gas Transit Ltd.
2017
HUi
SK
102.0 GWh/d
MGT Hungarian Gas Transit Ltd.
2017
SK
HUi
26.0 GWh/d
9HFVpV 0*7 )*6=
MGT Hungarian Gas Transit Ltd.
2017
HU
HUi
102.0 GWh/d
Comment: .
MGT Hungarian Gas Transit Ltd.
2017
HUi
HU
26.0 GWh/d