Expected Gas Sourcing
LNG ()
Technical Information (LNG)
LNG Facility
Shannon LNG Limited
Expected Volume (bcm/y)
3
Year1: 2.7 Year2: 2.9 Year3: 3.4
Storage Capacity (m3)
200,000
up to 800,000 at full build out.
Ship Size (m3)
265,000
Up to 265,000 m3 LNG
Reloading Ability
No
Time Schedule
Grant Obtention Date
01/01/2015
Delay Since Last TYNDP
Delay Explanation
PCI Details
PCI Benefits
Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project aims at
supplying directly or indirectly at least two Member States
General Criteria Fulfilled
Yes
Specific Criteria Fulfilled
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Ireland currently fails the EU's Infrastructure Standard N-1 test under Regulation EU 994 of 2010 and has to rely on a regional approach with
Great Britain (GB) to pass this important test. The Shannon LNG project, at full capacity, would allow Ireland to pass the N-1 test and provide
the added benefit of increasing the resilience of the GB system. This will also have the effect of increasing the resilience of the Great Britain gas
supply system as approximately 5 billion cubic metres per annum of demand could be removed from the GB System. The UK's DECC published
a National Preventive Action Plan in November 2012 in line with the requirements of Regulation (EU) 994/2010.The DECC report stated (page
19) the following with respect to the impact of the Shannon LNG project on Northern Ireland (part of the UK) ´Additionally the CAG project
also aims to develop a regional gas market within the context of the wider EU Internal Market in gas where Northern Ireland gas consumers
could access
Pipelines and Compressor Stations
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Shannon Pipeline
The pipeline is part of the core project and will connect the
LNG terminal to the National Gas Grid.