GALSI Pipeline Project

TRA-N-012

Project

Pipeline including CS

Non-FID

Update Date

09/05/2016

Advanced

Description

Gas pipeline project aiming to create a new link between Algeria and Italy via Sardinia. It will be the first direct route between Algeria and Italy

transporting 8 billions mc of gas. From El Kala (Koudiet Draouche) in Algeria an offshore section will cross the Mediterranean Sea going down to

2.800 m of depth getting to Porto Botte in Sardinia (which will be the entry point in the Italian RNG - Rete Nazionale Gasdotti or Gas National

Network). From Porto Botte an onshore section will cross Sardinia towards Olbia in the north of the island (with 39 offtake point along the route to

finally bring the long awaited gas to Sardinian users and thus remove the isolation of Sardinia from RNG). From Olbia then another offshore section

of the pipeline will cross the Tyrrhenian Sea at around 800 m of depth to get to Piombino in Tuscany where the pipeline will be connected with the

existing Rete Nazionale Gasdotti of Snam Rete Gas.

Regulatory Decisions and

similar material conditions

The Project has already received from the competent Italian Ministry (Ministero dello Sviluppo Economico) a Priority Allocation (Allocazione

Prioritaria) for 100% of its capacity for a period of 25 years.

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Koudiet Eddraouch (Galsi) (DZ)

Galsi S.p.A.

2019

DZ

DZi/GAL

258.0 GWh/d

Comment: Entry of GALSI International Section

Increment is equivalent to 8 bcm/y

Olbia (Galsi)

Galsi S.p.A.

2019

ITs

ITn/GAL

258.0 GWh/d

Comment: Increment is equivalent to 8 bcm/y

Galsi S.p.A.

2019

ITn/GAL

ITs

32.0 GWh/d

Comment: Equivalent to 1 bcm/y

Piombino (Galsi)

Galsi S.p.A.

2019

ITn/GAL

IB-ITs

226.0 GWh/d

Comment: Equivalent to 7 bcm/y

Porto Botte (Galsi)

Galsi S.p.A.

2019

DZi/GAL

ITs

258.0 GWh/d

Comment: Exit of GALSI International Section

Increment is equivalent to 8 bcm/y