Technical Information (LNG)

LNG Facility

Porto Empedocle LNG

Expected Volume (bcm/y)

8

Storage Capacity (m3)

320,000

Ship Size (m3)

155,000

Current design foresees that the terminal will be able to receive LNG tankers up to 155.000 m3 of capacity. Possible future

studies to allow the berthing of larger ships

Reloading Ability

Yes

PCI Details

PCI Benefits

Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

market integration: it provides a good contribution to the EU gas market integration, being the Italian system well interconnected with the rest

of EU gas market, through TAG and Transitgas, with positive impact on prices, gas flows, diversification, flexibility and price convergence.

security of supply: it provides a strong improvement of the SoS of the system, not only in Italy but also in other Member States; LNG is more

diversified and flexible than gas via pipeline and it gives access to a plurality of markets and players. sustainability: it provides additional gas-

fired operational flexibility required by the growing intermittent renewables generation; building a terminal in South Italy (Sicily) would help to

create local and sutainable jobs inthe area. competition: it provides additional competitive pressure to traditional import sources (Algeria,

Norway, Lybia, Russia) which are becoming more important because of the indegenous production depletion

Schedule

Start Date

End Date

Pre-Feasibility

01/2006

Feasibility

01/2006

FEED

03/2006

09/2006

Market Test

01/2018

Permitting

01/2009

10/2009

Supply Contracts

FID

10/2017

Construction

11/2017

12/2021

Commissioning

2021

2021

NDP and PCI Information

Part of NDP

Yes (Piano decennale di sviluppo SNAM

2015-2024)

NDP Number

n.a.

Currently PCI

No

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Negotiated

Applied for Exemption

Yes

Exemption Granted

Yes

Exemption in entry direction

100.00%

Exemption in exit direction

100.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 361 of 620

Current TYNDP : TYNDP 2017 - Annex A