Expected Gas Sourcing

LNG (DZ,QA,US), Nigeria, Trinindad and Tobago, Equatorial Guinea

Comments about the Third-Party Access Regime

The TPA exemption has been granted as per EC Decision issued on 7.5.2012 and Italian Ministry of Economic Development Decree issued on June 6th, 2012. Nuove Energie is

currently evaluating the possibility to revise its initial position of full TPA exemption.

Benefits

Main Driver

Others

Main Driver Explanation

Diversification: the presence of PE terminal facilitates a strong diversification of supply (in terms of both origins and counterparties) and makes Italy and

Europe more resilient in case of disruption and / or increase in prices of the other gas sources System flexibility: Porto Empedocle LNG terminal is a

strategic infrastructure for the supply of power technology like the CCGT plants, which provide flexibility to the electric system, also to compensate swift

changes in electricity generation from intermittent renewable source. It is a matter of fact that the growing level of intermittent renewable energy sources

requires more flexible operation of gas-fired power plants and that this implies a more flexible gas system

Benefit Description

The LNG terminal will provide some storage capacity within its tanks allowing to provide flexibility to the entire system and capability to cope gas

emergency. The Porto Empedocle LNG terminal will represent a future platform for additional LNG services for ship bunkering and truck loading that are

not currently existing in Italy.

Time Schedule

Grant Obtention Date

Delay Since Last TYNDP

about 2 years

Delay Explanation

Nuove Energie is awaiting the ministerial decree that have to follow the National Energy Strategy (SEN) which will identify the "Strategic

Infrastructure" for the gas italian system. Such decree should also clarifies possible incentive mechanisms for infrastructure which are classified

as "strategic".

Barriers

Barrier Type

Description

Financing

in the current italian market context, the PCI project status would help to finance the project