Benefits
Main Driver
Regulation SoS
Main Driver Explanation
Benefit Description
Market Integration (Increase of competition) and Security of Supply. The Italian Storage system is a market characterized by two operators (Stogit Spa 97%
and Edison Stoccaggio Spa 3% of the market share) and our project will enhance the level of competition at national level. it is necessary having in mind
that only storage jointly with production are present on national territory and can intervene in case of serious gas crisis. New storages are more flexible to
operate for security of supply. The project brings some benefits in case of disruption on critical gas supply routes (such as Ukraine and Libya) towards Italy
and more broadly Europe The project is also synergic to develop Italian system as a gas hub and to improve Europe security of supply.
Technical Information (UGS)
Storage Facility
Nuovi Sviluppi Edison
Stoccaggio
Storage Facility Type
Depleted Field
Multiple-Cycle
No
Working Volume (mcm)
0.00
in 10^6 Sm^3
Time Schedule
Grant Obtention Date
Delay Since Last TYNDP
1 year delay
Delay Explanation
Delays due to authorization process.
Schedule
Start Date
End Date
Pre-Feasibility
Feasibility
01/2016
01/2017
FEED
01/2016
01/2017
Market Test
Permitting
01/2016
01/2017
Supply Contracts
FID
12/2016
Construction
01/2016
01/2017
Commissioning
2017
2017
NDP and PCI Information
Part of NDP
Yes (National Energy Strategy)
NDP Number
No Number
Currently PCI
No
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
No
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 370 of 620
Current TYNDP : TYNDP 2017 - Annex A