Table of Contents Table of Contents
Previous Page  752-753 / 1248 Next Page
Information
Show Menu
Previous Page 752-753 / 1248 Next Page
Page Background

Technical Information (UGS)

Storage Facility

Palazzo Moroni

Storage Facility Type

Depleted Field

Multiple-Cycle

No

Working Volume (mcm)

50.00

in 10^6 Sm^3

PCI Details

PCI Benefits

Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project aims at

supplying directly or indirectly at least two Member States

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply

Specific Criteria Fulfilled Comments

Security of Supply and Market Integration (Increase of competition); The Italian Storage system is a market characterized by two operators

(Stogit Spa 97% and Edison Stoccaggio Spa 3% o f the market share), and our projects will enhance the level of competition at national level. It

is necessary having in mind that only storage jointly with production are present on national territory and can intervene in case of serious gas

crisis. New storages are more flexible to operate for security of supply and to work as back up to renewables. The project increases security of

supply on European gas system. The project brings some benefits in case of disruption on critical gas supply routes (such as Ukraine and Libya)

towards Italy and more broadly Europe Our project is also synergic to develop Italian system as a gas hub and to improve Europe security of

supply.

Schedule

Start Date

End Date

Pre-Feasibility

Feasibility

01/2009

01/2013

FEED

01/2013

01/2017

Market Test

01/2019

Permitting

01/2009

01/2017

Supply Contracts

FID

01/2017

Construction

01/2017

01/2019

Commissioning

2019

2019

NDP and PCI Information

Part of NDP

Yes (National Energy Strategy)

NDP Number

No Number

Currently PCI

No

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

No

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 373 of 620

Current TYNDP : TYNDP 2017 - Annex A