Depomures

General Information

Promoter

Engie Romania SA

Operator

Depomures

Host Country

Romania

Status

Planned

Website

Project's URL

Publication Approval Status

Approved

Sponsors

GDF International

59%

UGS-N-233

Project

Storage Facility

Non-FID

Update Date

23/05/2016

Advanced

Description

The project consists in the revamping and expansion of an existing gas storage facility of 300 mcm situated in Targu Mures, Central Romania. The

rationale of the project is three fold (i) increase operational independence by building its own compression unit as currently compression services

are rented from another party (ii) gradually expand the storage capacity (from 300 mcm to 400 mcm in a first stage and to 600 mcm in a second

stage) and (iii) increase flexibility of the storage by increasing injection and withdrawing capacity from the existing average 1.7 mcm/ day to approx.

5.0 mcm/day after implementation of the second stage. The implementation of the first stage has already been initiated with a partial investment to

be finalized in 2016, while the FID for the entire phase I of the development project is expected in 2016.

Regulatory Decisions and

similar material conditions

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

UGS Targu Mures

Depomures

2019

STcRO

RO

15.8 GWh/d

Comment: To be considered for modeling purposes.

Depomures

2019

RO

STcRO

15.8 GWh/d

Comment: To be considered for modeling purposes.

Depomures

2022

STcRO

RO

18.9 GWh/d

Comment: To be considered for modeling purposes.

Depomures

2022

RO

STcRO

18.9 GWh/d

Comment: To be considered for modeling purposes.

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM