Expected Gas Sourcing

Caspian Region, LNG (), Black Sea

Time Schedule

Grant Obtention Date

18/05/2015

Delay Since Last TYNDP

Stage 1- 9 months delay in commissioning Stage 2 ² months in commissioning

Delay Explanation

Stage 1 ² delay in the tender for teh FEED services related to the compresor stations Stage 2 ² uncertainties related to the execution of the

infrastructure which enables the connection with the production at the Black Sea

PCI Details

PCI Benefits

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation

prior to the commissioning of the project, Project concerns investment in reverse flow capacity

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Podisor - Horia

813

528

50

Total

528

50

Schedule

Start Date

End Date

Pre-Feasibility

12/2013

Feasibility

01/2014

12/2014

FEED

01/2016

02/2017

Market Test

10/2017

Permitting

01/2014

02/2017

Supply Contracts

FID

Construction

08/2017

09/2020

Commissioning

2020

2020

NDP and PCI Information

Part of NDP

Yes (Development Plan for the National

GTS 2016-2025)

NDP Number

7.1

Currently PCI

Yes (Stage I: 6.24.2 Stage II: 6.24.7)

CBCA Decision

Yes (2015-10-06)

Market Survey

Open Season(2017-10-02)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

Not Relevant

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 481 of 620

Current TYNDP : TYNDP 2017 - Annex A