Technical Information (UGS)

Storage Facility

UGS Moldova

Storage Facility Type

Depleted Field

Multiple-Cycle

No

Working Volume (mcm)

200.00

PCI Details

PCI Benefits

Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Increase of security of supply by adding new storage capacity in the Eastern part of Romania. This part of Romania includes major cities and

industry and has the coldest climate in Romania. Possible increase of security of supply in the Republic of Moldova by connection to the

Romanian - Moldavian Interconnection. Market integration: Some impact on GPI in RO under various price scenarios. Increase of security of

supply by adding new storage capacity in the Eastern part of Romania. This part of Romania includes some major cities and industry and has

the coldest climate in Romania. Possible increase of security of supply in the Republic of Moldova by connection to the Romanian - Moldavian

Interconnection. Sustainability: Positive project impact higher in 2030 and 2035 on the total EU bill, Gas Bill ex. NP ex. CO2, and Disrupted

Demand Cost under most price scenarios under FID. Highest impact on the total Disupted Demand Cost for various price sources, FID, in 2035.

Schedule

Start Date

End Date

Pre-Feasibility

06/2016

Feasibility

10/2016

10/2017

FEED

11/2017

11/2018

Market Test

10/2017

Permitting

03/2017

11/2018

Supply Contracts

07/2021

FID

12/2018

Construction

07/2019

05/2023

Commissioning

2023

2023

NDP and PCI Information

Part of NDP

No (S.N.G.N. ROMGAZ, the project

promoter, is not a TSO, it is only storage

operator, therefore it is not mandatory to

have a TYNDP, as Transgaz has. There is

no NDP country level.)

NDP Number

Currently PCI

Yes (6.20.5)

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

No

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 487 of 620

Current TYNDP : TYNDP 2017 - Annex A