Expected Gas Sourcing

Romania

Benefits

Main Driver

Regulation SoS

Main Driver Explanation

The project is able to have a major contribution to SoS on the N-S corridor Bulgaria - Romania - Hungary, which is currently included in the plans of

Transgaz S.A. envisaging the construction of a new pipeline between Podisor and Horia.

Benefit Description

Increasing safety of gas supply in Romania and South-East Europe by securing higher gas volumes to be stored; - Increasing the daily capacity and the

natural gas delivery flexibility; - Reducing gas imports during winter time; - Contributing to sustainability and market integration in the region We wish to

highlight the fact that any present or future pipeline project aiming to improve Romania·s interconnection to the gas systems in the region does need

underground storage facilities as a support to ensure base-load supply as well as flexibility of supply, both to and from Romania. Considering the

interconnection pipelines included in the TYNDP to neighbouring MS (Hungary reverse flow, Bulgaria) UGS facilities are indispensable assets for the

proper operation of such interconnections. Another reasons are the new discoveries in the Romanian sector of the Black Sea (e.g Domino1).

Time Schedule

Grant Obtention Date

01/11/2016

Delay Since Last TYNDP

Delay Explanation

Barriers

Barrier Type

Description

Regulatory

- no negotiated tariffs - no daily/weekly balance reports

Regulatory

Low or zero-priced short-term capacity

Market

Lack of market support

Market

Lack of market maturity

Financing

Amortization rates

Regulatory

Low rate of return