Expected Gas Sourcing

Caspian Region

Benefits

Main Driver

Others

Main Driver Explanation

Diversification of supply sources; New Markets competition; Market demand

Benefit Description

Links EU market with Azerbaijan (Caspian) gas source by the most direct route wich avoids sole reliance on pipelines. .

PCI Details

PCI Benefits

Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project aims at

supplying directly or indirectly at least two Member States

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Barriers

Barrier Type

Description

Permit Granting

long duration for obtaining permits

Market

market further integration with the local Project is required

Schedule

Start Date

End Date

Pre-Feasibility

Feasibility

06/2012

04/2015

FEED

01/2019

04/2020

Market Test

06/2021

Permitting

01/2018

09/2019

Supply Contracts

10/2022

FID

11/2020

Construction

06/2022

08/2026

Commissioning

2026

2026

NDP and PCI Information

Part of NDP

No (AGRI is not a Transmission System

Operator, so it is not necessary for its

project to be part of a National

Development Plan.)

NDP Number

Currently PCI

No

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Not Applicable

Considered Tariff Regime

Not Applicable

Applied for Exemption

Not Relevant

Exemption Granted

Not Relevant

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%