Azerbaijan, Georgia, Romania Interconnector - AGRI
General Information
Promoter
AGRI LNG Project Company
SRL (RO)
Operator
AGRI
Host Country
Romania
Status
Planned
Website
Project's URLPublication Approval Status
Approved
Sponsors
GOGC (GE)
25%
MVM (HU)
25%
ROMGAZ (RO)
25%
SOCAR (AZ)
25%
TRA-N-376
Project
Pipeline including CS
Non-FID
Update Date
07/05/2016
Non-Advanced
Description
The solution for the transmission of natural gas from Caspian region through the territory of Azerbaijan and Georgia, its liquefaction and
transportation via Black Sea to Romania and Hungary and potentially to other European markets; As a "standby LNG project", AGRI will implement
and operate the LNG portion: - the "natural gas the liquefaction Facilities") on Georgian Shore; - transport of LNG from Georgian shore to Romanian
shore; - the "natural Re-gasification terminal" on Romanian Shore. The project is pure LNG project and has no posibility to include technical details
so please see below: ================================= For LNG Project: Maximum Annual Capacity: 8.0 bcm/y; Maximum sendout
capacity: 22.0 milion cm/d; Storage capacity: 160,000.0 cm of LNG; Maximum ship cargo size: 2 x 140,000.0 mc of LNG;
==================================
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
AGRI / Constanta (RO)
AGRI
2026
GEa
RO
240.0 GWh/d
Comment: Regazification terminal
AGRI / Poti (GE)
AGRI
2026
GE?
GEa
240.0 GWh/d
Comment: Liquefaction terminal
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 492 of 620
Current TYNDP : TYNDP 2017 - Annex A