Table of Contents Table of Contents
Previous Page  986-987 / 1248 Next Page
Information
Show Menu
Previous Page 986-987 / 1248 Next Page
Page Background

Technical Information (UGS)

Storage Facility

UGS SARMASEL

Storage Facility Type

Depleted Field

Multiple-Cycle

No

Working Volume (mcm)

650.00

PCI Details

PCI Benefits

Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project aims at

supplying directly or indirectly at least two Member States

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

The project may contribute to SoS in Romania and neighbouring countries in SE Europe and lead to decrease of dependency on imports

during the cold season. Market Integration. Some impact of the project on GPI in various countries, especially in RO and BG under various price

scenarios, Some impact on Remaining Flexibility for BG in 2035 for Ukraine disruption for 2 weeks. Correlated impact on disrupted rate and

disrupted demand. Security of Supply. Impact of the project under Ukraine disruption only in Romania, after 2030 both in DC and 2W . N-1

impact under low and high infrastructure scenario. Minor impact on on supply price diversification and supply price dependence .

Sustainability. Positive project impact on the total EU bill, NP Bill ex. CO2, CO2 bill in 2025 and 2030 under most price scenarios under FID.

Positive impact on disrupted . Reducing bottlenecks. Significant impact on Marginal Price in Price in RO in 2025 and 2030

Schedule

Start Date

End Date

Pre-Feasibility

06/2016

Feasibility

10/2016

10/2017

FEED

11/2017

08/2018

Market Test

10/2017

Permitting

03/2017

09/2018

Supply Contracts

03/2021

FID

09/2018

Construction

04/2019

05/2022

Commissioning

2022

2022

NDP and PCI Information

Part of NDP

No (S.N.G.N. ROMGAZ S.A., the project

promotor, is not a TSO, therefore it is not

mandatory to have a TYNDP, as Transgaz

does. There is no NDP at country level. )

NDP Number

Currently PCI

Yes (6.20.6)

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

No

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 490 of 620

Current TYNDP : TYNDP 2017 - Annex A