Development on the Romanian territory of the NTS (BG²RO-HU-AT Corridor)

General Information

Promoter

SNTGN Transgaz S.A.

Operator

SNTGN Transgaz S.A.

Host Country

Romania

Status

Planned

Website

Project's URL

Publication Approval Status

Approved

Sponsors

SNTGN Transgaz S.A.

100%

TRA-N-358

Project

Pipeline including CS

Non-FID

Update Date

15/09/2016

Advanced

Description

The scope of the project is the construction of a new gas transmission pipeline to enable the connection between the Technological Hub Podisor

and GMS Horia and the construction of compressor stations along the route (CS Jupa, CS Bibesti and CS Podisor). Transgaz considers the

development of the BRHA Project in stages, as follows: Stage I *DV WUDQVPLVVLRQ SLSHOLQH 3RGLûRU 5HFDȾ µ x 63 bar, approximately 478 km long;

Three gas compressor stations (CS Podisor, CS Bibesti, CS Jupa) each station is equipped with two compressor units which may enable bidirectional

gas flows. Upon the completion of Stage I the following transmission capacities will be ensured: towards Hungary: 1,75 billion m3/year; towards

Bulgaria: 1,5 billion m3/year. Stage II JDV WUDQVPLVVLRQ SLSHOLQH 5HFDû²Horia µ x 63 bar, approximately 50 km long; expansion of the three gas

compressor stations (CS Podisor, CS Bibesti and CS Jupa) by mounting an additional compressor unit in each station); Expan

Regulatory Decisions and

similar material conditions

Cross Border Cost Allocation Decision (CBCA)

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Csanadpalota

SNTGN Transgaz S.A.

2020

HU

RO

76.5 GWh/d

SNTGN Transgaz S.A.

2020

RO

HU

126.1 GWh/d

Ruse (BG) / Giurgiu (RO)

SNTGN Transgaz S.A.

2020

RO

BGn

29.3 GWh/d

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 480 of 620

Current TYNDP : TYNDP 2017 - Annex A