![Show Menu](styles/mobile-menu.png)
![Page Background](./../common/page-substrates/page0083.png)
Immingham Storage Co Ltd – Immingham East Terminal
IME-SIS1 – Safety Instrument System Shutdown Conditions Proof Testing Procedure
P & I Design Ltd
DOCUMENT NO: SI483018_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: A DATE: 09.04.14
Tel: + 44 (0)1642 617444
PAGE 3 OF 17
Fax: + 44 (0)1642 616447
www.pidesign.co.uk1
REVISION HISTORY
Rev Description
A
Original Issue
This document will be revised with any additions to or removals from IME-SIS1 throughout
the operational lifecycle of the system.
2
INTRODUCTION
This document provides a procedure for shutdown condition functional proof testing to
ensure that the Safety Instrument System Life Cycle complies with the requirements of the
standard BS EN 61511.