Local Fuel – Shoreham Oil Terminal

Safety Requirement Specification

P & I Design Ltd

DOCUMENT NO: LF364005_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE:C DATE: 14.08.15

Tel: + 44 (0)1642 617444

PAGE 16 OF 19

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

4.6.3 Tank 3

ID:

SIF-3

Service

Reference:

Tank 3

High High Level in Tank

3 shuts down Gasoline

Pipeline valve.

Required SIL:

2

Proof Test Interval:

12 months

Response Time:

Sensor and Logic solver <2 seconds

Final Element approx. 90 seconds

Activation Method:

De-energise to trip (See G.R.)

Manual reset:

Required (See G.R.)

Safe State

Nuisance Trip

Requirements:

<1 in 10 years

Flow to tanks 1 & 3

stopped, Gasoline

Pipeline valve closed.

Diagnostics:

Required

Manual Shutdown:

Via Manual Control and site ESD

pushbutton

Regulatory Reqs.:

BS-EN61511

Process Setpoint:

9851 mm

(Reference 1)

External Alarm

Annunciated in Control Room and

Jetty.

Notes:

R.R.F. Required - 200

4.6.4 Tank 4

ID:

SIF-4

Service

Reference:

Tank 4

High High Level in Tank

4 shuts down Gasoline

Pipeline valve.

Required SIL:

2

Proof Test Interval:

12 months

Response Time:

Sensor and Logic solver <2 seconds

Final Element approx. 90 seconds

Activation Method:

De-energise to trip (See G.R.)

Manual reset:

Required (See G.R.)

Safe State

Nuisance Trip

Requirements:

<1 in 10 years

Flow to tanks 1 & 3

stopped, Gasoline

Pipeline valve closed.

Diagnostics:

Required

Manual Shutdown:

Via Manual Control and site ESD

pushbutton

Regulatory Reqs.:

BS-EN61511

Process Setpoint:

10152 mm

(Reference 1)

External Alarm

Annunciated in Control Room and

Jetty.

Notes:

R.R.F. Required - 200

Reference 1: Shoreham Tank LOC’s Spreadsheet