Table of Contents Table of Contents
Previous Page  33 / 443 Next Page
Information
Show Menu
Previous Page 33 / 443 Next Page
Page Background

Local Fuel – Shoreham Oil Terminal

Safety Requirement Specification

P & I Design Ltd

DOCUMENT NO: LF364005_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE:C DATE: 14.08.15

Tel: + 44 (0)1642 617444

PAGE 17 OF 19

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

4.6.5 Tank 5

ID:

LSHH5

Service

Reference:

Tank 5

High High Level in Tank

5 indicates on

Annunciator.

Required SIL:

0

Proof Test Interval:

12 months

Response Time:

Sensor and Logic solver <2

seconds

Activation Method:

De-energise to trip (See G.R.)

Manual reset:

n/a

Safe State

Nuisance Trip

Requirements:

<1 in 10 years

Flow to tank stopped,

Manual valve closed.

Diagnostics:

Required

Manual Shutdown:

Via Manual Control and site ESD

pushbutton

Regulatory Reqs.:

BS-EN61511

Process Setpoint:

10761 mm

(Reference 1)

External Alarm

Annunciated in Control Room

Notes:

4.6.6 Tank 6

ID:

LSHH6

Service

Reference:

Tank 6

High High Level in Tank

6 indicates on

Annunciator.

Required SIL:

0

Proof Test Interval:

12 months

Response Time:

Sensor and Logic solver <2

seconds

Activation Method:

De-energise to trip (See G.R.)

Manual reset:

n/a

Safe State

Nuisance Trip

Requirements:

<1 in 10 years

Flow to tank stopped,

Manual valve closed.

Diagnostics:

Required

Manual Shutdown:

Via Manual Control and site ESD

pushbutton

Regulatory Reqs.:

BS-EN61511

Process Setpoint:

10381 mm

(Reference 1)

External Alarm

Annunciated in Control Room

Notes: