Local Fuel PLC – The Shoreham Oil Terminal
SIS Management of Functional Safety – Safety Plan
P & I Design Ltd
DOCUMENT NO:LP364004_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: C DATE: 27.05.15
Tel: + 44 (0)1642 617444
PAGE 27 OF 28
Fax: + 44 (0)1642 616447
www.pidesign.co.uk19
DECOMMISSIONING
19.1 Decommissioning Requirements
Lifecycle
phase in
Figure 1
Activity
8
Decommissioning
Objectives
Inputs
Outputs
Deliverables
Responsible persons
and or organisations
To ensure that safety instrumented
functions remain appropriate during
decommissioning and that safety
integrity of interfacing systems is not
compromised.
Decommissioning
plan.
As-built SIS and
process
information
SIS and SIFs
placed out of
service
Decommissioned
SIS.
Functional Safety
Manager
Lifecycle
phase in
Figure 1
Verification Plan
9
Utilise QSF021_SIS – Stage 5 – Safety Instrument System Decommissioning
Checklist 12 - Decommissioning
19.2 Decommissioning Action History
Activity History
Date
Reference
Description
Roles
Persons assigned
18
19.3 Decommissioning Verification History
Lifecycle
phase in
Figure 1
Verification
9
Utilise QSF020_SIS – Stage 5 – Safety Instrument System Modification
Checklist 12 - Decommissioning
SI157105_RPT Revision A – Compliance Document - Section
8 – Checklist 12 – Decommissioning
QSF021 did not exist under Chevron ownership, all checklist
were contained in a compliance document