Local Fuel PLC – The Shoreham Oil Terminal

SIS Management of Functional Safety – Safety Plan

P & I Design Ltd

DOCUMENT NO:LP364004_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: C DATE: 27.05.15

Tel: + 44 (0)1642 617444

PAGE 27 OF 28

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

19

DECOMMISSIONING

19.1 Decommissioning Requirements

Lifecycle

phase in

Figure 1

Activity

8

Decommissioning

Objectives

Inputs

Outputs

Deliverables

Responsible persons

and or organisations

To ensure that safety instrumented

functions remain appropriate during

decommissioning and that safety

integrity of interfacing systems is not

compromised.

Decommissioning

plan.

As-built SIS and

process

information

SIS and SIFs

placed out of

service

Decommissioned

SIS.

Functional Safety

Manager

Lifecycle

phase in

Figure 1

Verification Plan

9

Utilise QSF021_SIS – Stage 5 – Safety Instrument System Decommissioning

Checklist 12 - Decommissioning

19.2 Decommissioning Action History

Activity History

Date

Reference

Description

Roles

Persons assigned

18

19.3 Decommissioning Verification History

Lifecycle

phase in

Figure 1

Verification

9

Utilise QSF020_SIS – Stage 5 – Safety Instrument System Modification

Checklist 12 - Decommissioning

SI157105_RPT Revision A – Compliance Document - Section

8 – Checklist 12 – Decommissioning

QSF021 did not exist under Chevron ownership, all checklist

were contained in a compliance document