Table of Contents Table of Contents
Previous Page  45 / 81 Next Page
Information
Show Menu
Previous Page 45 / 81 Next Page
Page Background

Local Fuel PLC – The Shoreham Oil Terminal

SIS Management of Functional Safety – Safety Plan

P & I Design Ltd

DOCUMENT NO:LP364004_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: C DATE: 27.05.15

Tel: + 44 (0)1642 617444

PAGE 24 OF 28

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

16

FUNCTIONAL SAFETY ASSESSMENT – STAGE 4

Stage 4 – After gaining experience in operating and maintenance.

16.1 Functional Safety Assessment Stage 4 Requirements

Lifecycle

phase in

Figure 1

Activity

10

Functional Safety Assessment Stage 4

Objectives

Inputs

Outputs

Deliverables

Responsible persons

and or organisations

To investigate and arrive at

a judgement on the

functional safety achieved

by the SIS

Planning for SIS

functional safety

assessment

SRS

Design Manual

Testing Records

Report of all

activations,

spurious trips,

failures and

maintenance

activities

Results of SIS

functional safety

assessment

Functional Safety

Assessment

Stage 4

Document

Functional Safety

Manager

FSA Chairperson

FSA Team

Functional Safety Assessment

Proposed Agenda:

The FSA will address the following as a minimum:

The recommendations and actions arising from the Stage 1, 2 & 3 FSA have been resolved and completed;

Review all proof testing, activation and false alarms of the SIS;

Review any issues in operation, maintenance and proof testing of the SIS;

Review the status of operating manuals and documentation;

Plans or strategies for implementing further FSA’s are in place;

16.2 Functional Safety Assessment Stage 4 Action History

Activity History – Terminal in Texaco/Chevron/Valero ownership

Date

Reference

Description

A Functional Safety Assessment Stage 4 was not conducted.

Discussions on the management of functional safety and review of each terminal was conducted

by the SIS Safety Committee.