Local Fuel plc - Shoreham Oil Terminal

Safety Instrument System Functional Safety Assessment Stage 5

P & I Design Ltd

DOCUMENT NO: LF364100_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 15.06.2015

Tel: + 44 (0)1642 617444

PAGE 32 OF 32

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

6

CONCLUSIONS

6.1

FSA meeting

Revision A of this FSA document details the preliminary assessment and does not include for

a review of the installed modification, which at the time of issue had not been installed.

6.2

System Enhancements

There are no intended system enhancements planned or needed for the SIS at this moment in

time.