Local Fuel plc - Shoreham Oil Terminal

Safety Instrument System Functional Safety Assessment Stage 5

P & I Design Ltd

DOCUMENT NO: LF364100_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 15.06.2015

Tel: + 44 (0)1642 617444

PAGE 27 OF 32

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

5.4.7 Schedules

Schedule

Number

Title

Revision

LF364001_SCH

Trip Matrix

A

LF364002_SCH

Instrument Schedule

A

LF364003_SCH

Testing matrix

A

LF364004_SCH

Testing Lifecycle matrix

A

LF364010_SCH

Cable Schedule – Sheet 1 of 2

A

LF364010_SCH

Cable Schedule – Sheet 2 of 2

A

Not reviewed within Revision A of this FSA.

5.4.8 Testing and Inspection Documentation

Report

Number

Title

Revision

LF364011_RPT

Documentation Verification

A

LF364012_RPT

Shutdown Conditions Proof Testing

A

LF364013_RPT

Operation Maintenance and Modification Lifecycle

A

Not reviewed within Revision A of this FSA.

5.4.9 Management of Functional Safety Document

The Management of Safety Plan requires to be updated to reflect the changes in the

documentation, together with the proposed modification and details of this FSA.

Action 11:

5.5

Validation and Testing Documentation

Not reviewed at Revision A of this FSA.

5.6

Operating, maintenance and emergency procedures

During the installation phase, operators are to be made familiar of the changes to the SIS. It

is not envisaged that any additional training, other than on the job familiarisation will be

required.

Not reviewed at Revision A of this FSA.