Local Fuel plc - Shoreham Oil Terminal

Safety Instrument System Functional Safety Assessment Stage 5

P & I Design Ltd

DOCUMENT NO: LF364100_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 15.06.2015

Tel: + 44 (0)1642 617444

PAGE 31 OF 32

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

5.11 Separate Hazards

The FSA discussed if any additional hazards were created by having the SIS. The only

identified hazard is the un-expected closure of the import valve resulting in an increased back

pressure to the ship. This is a know issue and the valve is specified to close slowly, typically

90 seconds, furthermore, a siren is provided at the jetty to inform the ship that the SIS has

activated and the valve is closing.

5.12 Other Protection Layers

Within the LOPA a number of other protection layers, mitigation layers, enabling events and

cross checks were included that were not part of the Safety Instrumented System but need to

be operated and maintained as they are fundamental to the calculated SIL of the SIS. It is

considered important that these non SIS protection layers are monitored to ensure they are

independent, effective and auditable.

Local Fuel plc confirmed that Motherwell provide maintenance and six monthly checks on

the tank gauging system. They provide full visit reports which are maintained by Local Fuel

plc.

Prior to Local Fuel plc taking over the Terminal, no drawings were available for the BPCS.

This has now been rectified and all documentation is available on site comprising of 48

drawings.