Local Fuel PLC – The Shoreham Oil Terminal
SIS Management of Functional Safety – Safety Plan
P & I Design Ltd
DOCUMENT NO:LP364004_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: C DATE: 27.05.15
Tel: + 44 (0)1642 617444
PAGE 19 OF 28
Fax: + 44 (0)1642 616447
www.pidesign.co.uk15.06.12
18
SI157036_RPT
Revision B
Controlled
Copy 08.06.12
SIS Shutdown
Conditions
Functional Testing
P&I Design
Ltd
P Lynch
18.11.13
18
SI157037_RPT
Revision C
Controlled
Copy 15.11.13
SIS
Documentation &
Hardware
Verification Test
Procedure
P&I Design
Ltd
D R Pearson
D B Faulkner
19.11.13
18
SI157036_RPT
Revision D
Controlled
Copy 08.11.13
SIS Shutdown
Conditions
Functional Testing
P&I Design
Ltd
D R Pearson
D B Faulkner
12.3 Post Installation
Upon Completion of the installation, commissioning and validation, and prior to wet
commissioning, the installation is to be tested and the design to be verified and all completed
documentation is to be reviewed.
12.3.1 Installation and Commissioning Verification History
Lifecycle
phase in
Figure 1
Validation - Terminal in Chevron/Valero ownership
9/9a
Utilise QSF017_SIS – Stage 3 – SIS Validation - Checklist 8 – Site Acceptance Test
SI157105_RPT Revision A – Compliance Document - Section
6 – Checklist 8 – Site Acceptance Test
QSF017 did not exist under Chevron ownership, all checklist
were contained in a compliance document