Local Fuel PLC – The Shoreham Oil Terminal

SIS Management of Functional Safety – Safety Plan

P & I Design Ltd

DOCUMENT NO:LP364004_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: C DATE: 27.05.15

Tel: + 44 (0)1642 617444

PAGE 17 OF 28

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

12.2 SIS Installation, Commissioning and Validation Action History

12.2.1 SIS Test Procedures

Activity History – Terminal in Texaco/Chevron/Valero ownership

Date

Reference

Description

Roles

Persons assigned

10.04.08

18

SI157035_RPT

Revision A

SIS Panel FAT

Procedure -

Original Issue

P&I Design

Ltd

D S Regan BEng

D R Ransome

09.07.08

18

SI157035_RPT

Revision B

SIS Panel FAT

Procedure – Panel

Test

P&I Design

Ltd

D S Regan BEng

D B Faulkner

22.10.13

18

SI157035_RPT

Revision C

SIS Panel FAT

Procedure

P&I Design

Ltd

D S Regan BEng

D B Faulkner

26.03.08

SI157036_RPT

Revision A

SIS Shutdown

Conditions

Functional Test

Procedure –

Original Issue

P&I Design

Ltd

D S Regan BEng

D R Ransome

17.11.08

SI157036_RPT

Revision B

SIS Shutdown

Conditions

Functional Test

Procedure –

Tankside Valves

Removed

P&I Design

Ltd

D S Regan BEng

D R Ransome

27.07.12

SI157036_RPT

Revision C

SIS Shutdown

Conditions

Functional Test

Procedure – Wet

Testing Added

P&I Design

Ltd

D S Regan BEng

D B Faulkner

30.07.12

SI157036_RPT

Revision D

SIS Shutdown

Conditions

Functional Test

Procedure – Wet

Testing Corrected

P&I Design

Ltd

D S Regan BEng

D B Faulkner

28.04.08

SI157037_RPT

Revision A

SIS

Documentation &

Hardware

Verification Test

Procedure –

Original Issue

P&I Design

Ltd

P Lynch

D R Ransome

09.05.11

SI157037_RPT

Revision B

SIS

Documentation &

Hardware

Verification Test

Procedure – 2011

Testing Update

P&I Design

Ltd

P Lynch

D S Regan BEng

08.06.12

SI157037_RPT

Revision C

SIS

Documentation &

Hardware

Verification Test

Procedure – 2012

Testing Update

P&I Design

Ltd

P Lynch

D S Regan BEng

26.03.08

SI157038_RPT

Revision A

SIS Power Failure

Functional Testing

Procedure –

Original Issue

P&I Design

Ltd

D S Regan BEng

D R Ransome

17.11.08

SI157038_RPT

Revision B

SIS Power Failure

Functional Testing

Procedure –

Tankside Valves

Removed

P&I Design

Ltd

D S Regan BEng

D R Ransome

23.07.12

SI157038_RPT

Revision C

SIS Power Failure

Functional Testing

Procedure – Tank

3 Relay No

Corrected

P&I Design

Ltd

D S Regan BEng

D R Ransome