Local Fuel PLC – The Shoreham Oil Terminal

SIS Management of Functional Safety – Safety Plan

P & I Design Ltd

DOCUMENT NO:LP364004_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: C DATE: 27.05.15

Tel: + 44 (0)1642 617444

PAGE 23 OF 28

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

15.2 Operation and Maintenance Action History

15.2.1 SIS Testing Plan

Activity History – Terminal in Local Fuel PLC ownership

Date

Reference

Description

Roles

Persons assigned

20.05.15

LF364013_RPT

Revision A

SIS Operation,

Maintenance and

Modification

Lifecycle

P&I Design

Ltd

D B Faulkner

M Morgan

15.2.2 SIS Shutdown Conditions Functional Test

Activity History - Terminal in Local Fuel plc ownership

Date

Reference

Description

Roles

Persons assigned

02.11.14

SI157037_RPT

Revision C

Controlled

Copy 25.11.14

SIS

Documentation

and Hardware

Verification

Procedure

P&I Design

Ltd

Local Fuel

plc

D R Pearson

M Morgan

L Salvidge

03.11.14 SI157036_RPT

Revision D

Controlled

Copy 25.11.14

SIS Shutdown

Conditions

Functional Test

Procedure

P&I Design

Ltd

Local Fuel

plc

D R Pearson

M Morgan

L Salvidge

15.3 Operation and Maintenance Verification History

Lifecycle

phase in

Figure 1

Verification

9

Utilise QSF018_SIS – Stage 4 – Safety Instrument Operation & Maintenance

Checklist 9 - Operation & Management

9

Utilise QSF019_SIS – Stage 4 – Safety Instrument Operation & Maintenance

Checklist 10 – Proof Testing & Maintenance

SI157105_RPT Revision A – Compliance Document - Section

7 – Checklist 9 - Operation & Management

QSF018 did not exist under Chevron ownership, all checklist

were contained in a compliance document

SI157105_RPT Revision A – Compliance Document - Section

7 – Checklist 10 – Proof Testing & Maintenance

QSF019 did not exist under Chevron ownership, all checklist

were contained in a compliance document