Local Fuel PLC – The Shoreham Oil Terminal
SIS Management of Functional Safety – Safety Plan
P & I Design Ltd
DOCUMENT NO:LP364004_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: C DATE: 27.05.15
Tel: + 44 (0)1642 617444
PAGE 16 OF 28
Fax: + 44 (0)1642 616447
www.pidesign.co.uk12
INSTALLATION, COMMISSIONING AND VALIDATION
12.1 SIS Installation, Commissioning and Validation Requirements
Lifecycle
phase in
Figure 1
Activity
5
Installation, Commissioning and Validation
Objectives
Inputs
Outputs
Deliverables
Responsible persons
and or organisations
To
integrate and test the SIS
To validate that the SIS meets in all
respects the requirements for safety in
terms of the required safety
instrumented functions and the
required safety integrity
SIS design
SIS integration
test plan
SIS safety
requirements
Plan for the
safety validation
of the SIS
Fully functioning
SIS in
conformance
with the SIS
design
Results of SIS
integration tests
Results of the
installation,
commissioning
and validation
activities
Fully functioning
SIS
Safety
Instrumented
System Manual
with all testing
documentation
included
Functional Safety
Manager
Designers
SIS Supplier
Lifecycle
phase in
Figure 1
Validation Verification Plan
9/9a
Utilise QSF017_SIS – Stage 3 – SIS Validation - Checklist 8 – Site Acceptance Test