Local Fuel PLC – The Shoreham Oil Terminal

SIS Management of Functional Safety – Safety Plan

P & I Design Ltd

DOCUMENT NO:LP364004_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: C DATE: 27.05.15

Tel: + 44 (0)1642 617444

PAGE 16 OF 28

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

12

INSTALLATION, COMMISSIONING AND VALIDATION

12.1 SIS Installation, Commissioning and Validation Requirements

Lifecycle

phase in

Figure 1

Activity

5

Installation, Commissioning and Validation

Objectives

Inputs

Outputs

Deliverables

Responsible persons

and or organisations

To

integrate and test the SIS

To validate that the SIS meets in all

respects the requirements for safety in

terms of the required safety

instrumented functions and the

required safety integrity

SIS design

SIS integration

test plan

SIS safety

requirements

Plan for the

safety validation

of the SIS

Fully functioning

SIS in

conformance

with the SIS

design

Results of SIS

integration tests

Results of the

installation,

commissioning

and validation

activities

Fully functioning

SIS

Safety

Instrumented

System Manual

with all testing

documentation

included

Functional Safety

Manager

Designers

SIS Supplier

Lifecycle

phase in

Figure 1

Validation Verification Plan

9/9a

Utilise QSF017_SIS – Stage 3 – SIS Validation - Checklist 8 – Site Acceptance Test