Local Fuel PLC – The Shoreham Oil Terminal
SIS Management of Functional Safety – Safety Plan
P & I Design Ltd
DOCUMENT NO:LP364004_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: C DATE: 27.05.15
Tel: + 44 (0)1642 617444
PAGE 15 OF 28
Fax: + 44 (0)1642 616447
www.pidesign.co.uk11
FUNCTIONAL SAFETY ASSESSMENT – STAGE 2
Stage 2 - After the SIS has been designed
11.1 Functional Safety Assessment Stage 2 Requirements
Lifecycle
phase in
Figure 1
Activity
10
Functional Safety Assessment Stage 2
Objectives
Inputs
Outputs
Deliverables
Responsible persons
and or organisations
To investigate and arrive at
a judgement on the
functional safety achieved
by the SIS.
Planning for SIS
functional safety
assessment
SRS
Design Manual
PFD & SIL
Verification
Calculations
Results of SIS
functional safety
assessment
Functional Safety
Assessment
Stage 2
Document
Functional Safety
Manager
FSA Chairperson
FSA Team
Functional Safety Assessment
Proposed Agenda:
The FSA will address the following as a minimum:
The recommendations and actions arising from the Stage 1 FSA have been resolved and completed;
That project design change procedures are in place and properly implemented.
The SIS is designed in accordance with the SRS, any differences to be identified and resolved.
Plans or strategies for implementing further FSA’s are in place.
11.2 Functional Safety Assessment Stage 2 Action History
Activity History – Terminal in Texaco/Chevron/Valero ownership
Date
Reference
Description
A Functional Safety Assessment Stage 2 was not conducted.