Local Fuel PLC – The Shoreham Oil Terminal

SIS Management of Functional Safety – Safety Plan

P & I Design Ltd

DOCUMENT NO:LP364004_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: C DATE: 27.05.15

Tel: + 44 (0)1642 617444

PAGE 15 OF 28

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

11

FUNCTIONAL SAFETY ASSESSMENT – STAGE 2

Stage 2 - After the SIS has been designed

11.1 Functional Safety Assessment Stage 2 Requirements

Lifecycle

phase in

Figure 1

Activity

10

Functional Safety Assessment Stage 2

Objectives

Inputs

Outputs

Deliverables

Responsible persons

and or organisations

To investigate and arrive at

a judgement on the

functional safety achieved

by the SIS.

Planning for SIS

functional safety

assessment

SRS

Design Manual

PFD & SIL

Verification

Calculations

Results of SIS

functional safety

assessment

Functional Safety

Assessment

Stage 2

Document

Functional Safety

Manager

FSA Chairperson

FSA Team

Functional Safety Assessment

Proposed Agenda:

The FSA will address the following as a minimum:

The recommendations and actions arising from the Stage 1 FSA have been resolved and completed;

That project design change procedures are in place and properly implemented.

The SIS is designed in accordance with the SRS, any differences to be identified and resolved.

Plans or strategies for implementing further FSA’s are in place.

11.2 Functional Safety Assessment Stage 2 Action History

Activity History – Terminal in Texaco/Chevron/Valero ownership

Date

Reference

Description

A Functional Safety Assessment Stage 2 was not conducted.