Previous Page  22-23 / 36 Next Page
Information
Show Menu
Previous Page 22-23 / 36 Next Page
Page Background

'The Pod'

Meeting space incorporating video-conferencing

and live streaming from the Visualisation area (see

above).

The Atrium

A flexible space for meetings and social events,

open to all.

Office space

Used by Cranfield staff and other users of the AIRC

including industry and visiting academics.

The Open Lab

1500m

2

in size. Mainly used for the testing of

intelligent robots in the structural assembly of

aircraft parts. Robots include a FANUC CR-35iA

(pictured), the world's strongest collaborative robot

able to lift 35 kg. It uses sensors to determine the

proximity of a person/object and stops if touched.

Sliding doors (18m x 6m) allow for aircraft around the

size of a Jetstream 31 to pass through.

Also home to various aircraft structures - including

a full size aircraft wing - used for testing assembly

procedures and structural integrity.

Presenting our

AIRC

Visualisation area

Facilities include an air traffic management simulator

(pictured) and large aircraft flight simulator, used to test

new ideas and impact on aircraft. Feedback screens

linked to the Visualisation lab and 'The Pod' meeting

area (see below).

In October a topping out ceremony was held to mark the highest point of the building being reached and over the coming months work

will continue on kitting the building out.

The £35 million AIRC builds on our existing expertise and will foster collaboration between industry and academia, providing

capabilities comparable with the leading aerospace facilities across Europe and the world.

Tim Mackley, a Senior Lecturer in Systems Engineering, who will head up the Centre said: “The AIRC represents a

new approach to performing research in an increasingly integrated world. I am looking forward to working with our

partners in industry and across academia to develop what is intended to be a key capability in aerospace research,

both in the UK and internationally.”

The Centre’s uniqueness is its focus on integration in aerospace, where new aerospace technologies will be

rapidly developed and tested for current and future aircraft and airspace concepts using modern simulation and

visualisation techniques, creating a virtual aerospace environment for research.

Its design emphasises collaborative working, with spaces for partner firms to carry out their research while calling on the wider

facilities of the University. There is a large open area in the building for mechanical, electrical and structural type research; hangar

doors will directly open on to the airfield, designed to accommodate a 19-seater aircraft like our own Jetstream 31.

This project has been co-funded by Airbus, Rolls-Royce, the Higher Education Funding Council for England (HEFCE) and ourselves.

Closed lab areas

These labs will be used for research related to UAVs,

structures, assembly and intelligent automation

needing a controlled environment.

AIRC Factoids

Dimensions

– 16.6m high, 67.5m long, 40m wide

Time taken to build

– design and enabling works approx 12 months; construction approx 12 months

Materials used

– over 500 tons of steel and over 90 tons of glass

Crane used in construction

– widest in the UK (40m wide) and the second widest in Europe

Manpower

– Over 500 people worked on the build, amounting to over 60,000 man hours.

Due for completion at the end of the year and set to officially open

in mid-2017, our Aerospace Integration Research Centre (AIRC) is

certainly starting to make its mark on the Cranfield landscape.

22

Perspectives

Keeping staff informed

December 2016