SPONSORS
GENERAL INFORMATION
FINANCING
TEN-E Project ?
–
In PCI list ?
–
IGAs
–
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
TRA-N-007
Development for new imports from the South (Adriatica Line)
Non-FID
Pipeline including CS
None
Multilateral Financing
Web Link
013_2014/Ten-year-Plan/index.html
Promoter
Snam Rete Gas S.p.A.
Not part of TEN-E
Public Financing
Operator
Snam Rete Gas S.p.A.
Yes
Private Financing
Considered TPA Regime
Regulated
End of permitting phase
# of Pipelines, nodes, CS
1
Applied for Exemption ?
No
Construction
Total Compressor Power (MW)
+33.00
Considered Tariff Regime
Regulated
FID
Total Pipeline Length (km)
+430
% Exemption in entry direction
–
Last completed Phase :
Planned
Diameter (range) (mm)
DN 1200
Exemption granted ?
Not relevant
Commissioning
2019
Expected Load Factor
+0.65
% Exemption in exit direction
–
Diameter (range) (inches)
48"
Print
ENTSOG TYNDP 2013-2013 - Annex A
Southern Corridor GRIP 2014–2023 Annex B |