ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects - page 35

SPONSORS
GENERAL INFORMATION
FINANCING
TEN-E Project ?
In PCI list ?
IGAs
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
TRA-F-195
AGRI Pipeline - Hungarian section
FID
Pipeline including CS
1
Multilateral Financing
Web Link
Promoter
Magyar Gaz Tranzit Zrt.
Not part of TEN-E
Public Financing
Operator
MGT Hungarian Gas Transit Ltd.
Yes
Private Financing
Considered TPA Regime
Not applicable
End of permitting phase
# of Pipelines, nodes, CS
1
Applied for Exemption ?
No
Construction
Total Compressor Power (MW)
Considered Tariff Regime
Not applicable
FID
Total Pipeline Length (km)
% Exemption in entry direction
Last completed Phase :
Diameter (range) (mm)
Exemption granted ?
no
Commissioning
2023
Expected Load Factor
% Exemption in exit direction
Diameter (range) (inches)
Print
ENTSOG TYNDP 2013-2013 - Annex A
Southern Corridor GRIP 2014–2023 Annex B |
35